Commercial EICR
& Fixed-Wire Testing
Structured inspection and testing of fixed electrical installations in occupied buildings — planned around your operations, with clear circuit records, prioritised findings and practical information for maintenance planning.
A useful EICR is more than a pass-or-fail document
The inspection should establish the condition of the installation within an agreed scope, identify safety concerns and leave records that support proportionate maintenance. We agree access, limitations and operational constraints before testing begins — and write reports that facilities teams, not just electricians, can act on.
Commercial Testing With Clear Records
Inspection and testing is carried out to BS 7671 and recognised industry guidance. We plan the work around the building, distribution system and operational needs. The report records what was inspected and tested, any limitations, the observations raised and the recommended interval to the next inspection.
Typically carried out for facilities managers, schools and academies, commercial landlords and managing agents, and office, retail and hospitality operators.
From First Call to Final Report
Discussion and site review
We talk through how the building is used, occupancy, working hours, the number and location of distribution boards and any operational or safety constraints. Where possible we visit before quoting so testing can be planned in sensible phases.
Pre-inspection information pack
You receive a written scope, our proposed working approach, access requirements and site-specific considerations. We’ll usually ask for:
- access to electrical rooms, risers and plant areas
- your asbestos register
- previous EICRs, drawings or circuit charts, if available
- site rules, permits and any keyholder or escort arrangements
Inspection and testing
Visual inspection of the installation, dead testing with circuits safely isolated in an agreed sequence, and live testing to confirm protective measures. We keep your site contact informed throughout, so staff know what is happening and when.
Digital report and certification
The report is issued through NICEIC’s cloud-based certification platform, giving you secure digital records, a clear audit trail and a certificate that can’t be altered once issued. It’s written so both technical and non-technical stakeholders can see the priorities.
Prioritised findings and next steps
We explain the findings, which items need action now, which can be planned and which simply need monitoring. Where you want it, we provide an itemised remedial quotation per observation.
Observation Codes Explained
Danger present. Risk of injury. Immediate action required — we will make safe or tell the dutyholder straight away.
Potentially dangerous. Urgent remedial action required.
Improvement recommended. Does not by itself make the report unsatisfactory.
Further investigation required without delay, where an apparent deficiency could not be fully assessed. Under Amendment 4 it no longer automatically makes the report unsatisfactory.
Any C1 or C2 observation makes the overall report unsatisfactory, and a report with only C3 observations can still be satisfactory. Under BS 7671 Amendment 4, an FI no longer automatically makes a report unsatisfactory: the inspector decides, based on what the FI could conceal, and records the reasoning in the report.
Typical Findings in Commercial Installations
Support for Planned Electrical Maintenance
The Electricity at Work Regulations require electrical systems to be maintained so far as is reasonably practicable to prevent danger. HSE guidance identifies inspection and, where necessary, testing as an essential part of preventive maintenance. An EICR can support that process, but it does not by itself discharge every duty or replace ongoing maintenance.
Commercial inspection intervals are not set by one universal rule. IET guidance suggests typical maximum intervals — for example five years for offices, shops and educational buildings and three years for industrial premises — but the right interval depends on the installation, its use, environment, condition, previous findings and any dutyholder, insurer or sector requirements. The inspector records the recommended date in the report.
Where records are incomplete, we can combine testing with electrical asset mapping and consistent board identification so future maintenance teams can understand the distribution system more quickly.
What good electrical support should look like
FAQs — Commercial EICR
“My family and I have used Alan many times over the years. He always does a brilliant job every time and is very knowledgeable. I couldn’t recommend Inspect Electrical enough!”
Commercial EICR — London & the South East
NICEIC Approved Contractor · Defined testing scope · Clear digital reporting and maintenance records
