✅
NICEIC Approved ContractorIndependently assessed
📄
Written ScopeClear quotation before work
📍
Local CoverageChislehurst, Blackheath & SE London
Evidence for Dutyholders

A useful EICR is more than a pass-or-fail document

The inspection should establish the condition of the installation within an agreed scope, identify safety concerns and leave records that support proportionate maintenance. We agree access, limitations and operational constraints before testing begins.

Scoped
Extent and limitations agreed
Recorded
Circuit results and observations
Planned
Findings prioritised for action
What’s Included

Commercial Testing With Clear Records

We plan the work around the building, distribution system and operational needs. The report records what was inspected and tested, any limitations, the observations raised and the recommended interval to the next inspection.

Pre-test scope and access planning
Distribution board and circuit identification
Inspection of the fixed installation
Electrical testing and recorded results
C1, C2, C3 and FI observations
Clear limitations and inaccessible areas
Digital Electrical Installation Condition Report
Separate remedial quotation where requested
Maintenance and Compliance Records

Support for Planned Electrical Maintenance

The Electricity at Work Regulations require electrical systems to be maintained so far as is reasonably practicable to prevent danger. HSE guidance identifies inspection and, where necessary, testing as an essential part of preventive maintenance. An EICR can support that process, but it does not by itself discharge every duty or replace ongoing maintenance.

Commercial inspection intervals are not set by one universal rule for every building. The appropriate interval depends on the installation, its use, environment, condition, previous findings and any relevant dutyholder, insurer or sector requirements.

Where records are incomplete, we can combine testing with electrical asset mapping and consistent board identification so future maintenance teams can understand the distribution system more quickly.

Common Questions

FAQs — Commercial EICR

How often does a commercial property need an EICR?
There is no single interval that suits every commercial installation. The previous report, building use, environment, condition and applicable risk or sector requirements should inform the inspection frequency.
Will testing disrupt the building?
Some tests require circuits to be isolated. We agree access, critical loads and a practical sequence in advance so disruption can be managed and limitations recorded.
Can you test outside normal hours?
Where required, scheduling can be discussed during scoping. Availability and any additional arrangements are confirmed in the written quotation.
What happens if defects are found?
The report records and classifies observations. We explain the findings and can provide a separate remedial quotation; urgent danger is brought to the dutyholder’s attention promptly.
Can you identify poorly labelled boards and circuits?
Yes. Circuit and asset identification can be included in the agreed scope. For larger or poorly documented sites, our Electrical Asset Mapping service may be appropriate.
Does an EICR guarantee legal compliance?
No single report guarantees compliance with every legal or operational duty. It provides evidence about the condition of the fixed electrical installation within its stated scope and limitations.
What premises do you cover?
We undertake agreed commercial inspection work for offices, schools, managed properties and other suitable premises across London and the South East.
Request a Site Assessment
Alan Woodhams
NICEIC Approved · Chislehurst
Clear scope · Written quote · Appropriate certification where required
★★★★★

“My family and I have used Alan many times over the years. He always does a brilliant job every time and is very knowledgeable. I couldn’t recommend Inspect Electrical enough!”

Katie
Google Review
Plan Your Fixed-Wire Testing

Commercial EICR — London & the South East

NICEIC Approved Contractor · Defined testing scope · Clear digital reporting and maintenance records

Call Alan
Based in
Chislehurst, SE London
Response
We aim to reply within 1 business day
Scroll to Top